It is February, and Bradley continues to head to the house on a daily basis to run wires, lay pipe and frame.  This month, in addition to another throw-down with PSE, Bradley also had to work out another kidney stone.  Fortunately this one moved a little faster and went from diagnosis to expulsion in about three weeks instead of ten.   We now are looking to April as a move-in date.

PICT0217

This is a view from our fireplace into our kitchen.  It is a pretty good example of the house as a whole.

PICT0207

The oven and microwave are framed in,

PICT0205

The electrical boxes are wired and labled,

PICT0229

And the light cans are in awaiting bulbs, plaster, and sheetrock.

PICT0216

Here is the view from the kitchen towards the fireplace.  The fireplace is framed in with the gas pipes running to it.

PICT0227

Bradley is also putting in the plumbing.  Here are the links that seal the pipes together.

PICT0220PICT0223PICT0222

The kids had a great time playing with the hot and cold water pipes.  Putting these in is the big job for the week.  The plumbing advisor came by this past weekend and gave the go ahead for sealing everything together.

PICT0228

This is the pipe coming out of the floor, heading towards the future placement of the kitchen sink.  Bradley, with is own two hands and a little help from our dads and his uncle, is plugging away and we are getting closer and closer to having our home to live in!