It is February, and Bradley continues to head to the house on a daily basis to run wires, lay pipe and frame. This month, in addition to another throw-down with PSE, Bradley also had to work out another kidney stone. Fortunately this one moved a little faster and went from diagnosis to expulsion in about three weeks instead of ten.  We now are looking to April as a move-in date.
This is a view from our fireplace into our kitchen. It is a pretty good example of the house as a whole.
The oven and microwave are framed in,
The electrical boxes are wired and labled,
And the light cans are in awaiting bulbs, plaster, and sheetrock.
Here is the view from the kitchen towards the fireplace. The fireplace is framed in with the gas pipes running to it.
Bradley is also putting in the plumbing. Here are the links that seal the pipes together.
The kids had a great time playing with the hot and cold water pipes. Putting these in is the big job for the week. The plumbing advisor came by this past weekend and gave the go ahead for sealing everything together.
This is the pipe coming out of the floor, heading towards the future placement of the kitchen sink. Bradley, with is own two hands and a little help from our dads and his uncle, is plugging away and we are getting closer and closer to having our home to live in!